Tender # | Tender | Revision | Published | Closing | Attachment(s) |
NPTAB FD 114-2025
|
Construction of 627m Light Duty Revetment Required for Rose Hall Estate A compulsory site meeting will be held on 07th May,2025 at 13:30 hours. Meeting place is the entrance gate to the Estate.
|
2
|
4/30/2025 3:03:49 PM
|
5/13/2025 9:00:00 AM
|
NPTAB FD 114-2025 Construction of 627m Light Duty Revetment.pdf (3 MB)
||
Construction of 627m Light Duty Revetment- Rose Hall Estate.xlsx (42 KB)
||
Addendum_04302025122214.pdf (99 KB)
||
|
NPTAB FA 42-2025
|
Supply and Delivery of One New 4WD/AWD Fire Truck (Retender) Required for Albion Estate
|
|
4/16/2025 8:01:41 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 42-2025 Supply and Delivery of One New Firetruck_AN (Retender).pdf (1 MB)
||
|
NPTAB FA 96--2025
|
Supply and Delivery of #1 Mill Final Drive Required for Uitvlugt Estate
|
1
|
4/22/2025 2:52:23 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 96-2025 Supply and Delivery of #1 Mill Final Drive_ICBU.pdf (1 MB)
||
Mill Final Drive Drawing for Uitvlugt Estate.pdf (715 KB)
||
|
NPTAB FA 105-2025
|
Supply and Delivery of Clarifier Centre Drum Gear Box and Drive Required for Albion Estate
|
|
4/16/2025 8:18:15 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 105-2025 Supply and Deliveryof Clarifier_AN.pdf (1 MB)
||
|
NPTAB FA 112-2025
|
Supply and Delivery Gear Box, Motor, Starter, Dyno Drive and Electronic Controller Required for Albion Estate
|
|
4/16/2025 8:21:24 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 112-2025 Supply and Delivery for Gear Box, Motor_AN.pdf (1 MB)
||
|
NPTAB FA 123-2025
|
Supply and Delivery of One Double Girder Crane Complete with Motors, Gearboxes and Controls; Comprising of Two (2) 10 Ton Cartridges that can be Operational Independently Required for Blairmont Estate
|
|
4/16/2025 8:26:33 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 123-2025 Supply and Delivery of One Double Girder Crane_BCF.pdf (2 MB)
||
|
NPTAB FA 125-2025
|
Supply and Delivery of Steam Trap Required for Rose Hall Estate
|
|
4/16/2025 8:29:49 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 125-2025 Supply and Delivery of Steam Trap_RH.pdf (1 MB)
||
|
NPTAB FA 126-2025
|
Rehabilitation of Albion Boiler House Roof Required for Albion Estate
|
2
|
5/2/2025 11:28:46 AM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 126-2025 Rehabilitation of Albion Boiler House Roof.pdf (6 MB)
||
Addendum AN Boiler Roof.pdf (154 KB)
||
Copy of Albion Rehab of Albion boiler House Roof blank.xlsx (22 KB)
||
|
NPTAB FA 133-2025
|
Supply and Delivery of Chiller, Dehumidifier, Blower and Heat Exchange for 17 Ton/hr Rotary Sugar Drier Required for Albion Estate
|
|
4/16/2025 8:41:13 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 133-2025 Supply and Delivery for Chiller, Dehumidifier_AN.pdf (1 MB)
||
|
NPTAB FD 115-2025
|
Construction of 296m Heavy Duty Revetment (Lot# 1-5) Required for Rose Hall Estate
|
|
4/16/2025 9:02:25 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FD 115-2025 Construction of 296 meter Heavy Duty Revetment.pdf (4 MB)
||
BOQ for 296m HDR at Rose Hall Estate.xlsx (189 KB)
||
|
NPTAB FD 116-2025
|
Construction of 300m Heavy Duty Revetment at Uitvlugt Estate - Lot 1-2 A Compulsory Site Meeting will be held at Uitvlugt Estate on 30th April,2025 at 9:00 hours. Meeting place is the entrance gate to the Estate.
|
|
4/16/2025 9:20:36 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FD 116-2025 Construction of 300 meter Heavy Duty Revetment.pdf (4 MB)
||
Lot#1 Construction of 150m HDR at Uitvlugt West Sluice - PCMD (2).xlsx (52 KB)
||
Lot#2 Construction of 150m HDR at Uitvlugt Groenveldt Sluice - PCMD (3).xlsx (52 KB)
||
|
NPTAB FD 128-2025
|
Construction of 4km AWR on Fl Ver Sideline Dam at Blairmont Estate A compulsory site meeting will be held at Blairmont Estate on 28th April,2025 at 1:30 hours. Meeting place is the entrance gate to the Estate.
|
|
4/16/2025 9:31:21 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FD 128-2025 Construction of 4km AWR on Fl Ver Sideline Dam at Blairmont Estate.pdf (3 MB)
||
Construction of 4km All weather Road on Fl Ver Sideline Dam at Blairmont Estate - PCMD.xlsx (27 KB)
||
|
NPTAB FD 129-2025
|
Construction of 5km AWR at Albion Estate - Lot 1-2 A compulsory site meeting will be held at Albion Estate on 28th April,2025 at 9:00 hours. Meeting place is the entrance gate to the Estate.
|
|
4/16/2025 9:43:48 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FD 129-2025 Construction of 5km AWR at Albion Estate.pdf (4 MB)
||
Construction of 4km AWR from Resource 43 to Albion 125 cross at Albion Estate - PCMD.xlsx (24 KB)
||
Construction of 1km All weather Road from Exp C to Exp A cross Albion Estate - PCMD.xlsx (25 KB)
||
|
NPTAB FD 130-2025
|
Construction of 2km All-Weather Road - Uitvlugt Estate towards Stewartville West Cross A compulsory site meeting will be held at Uitvlugt Estate on 30th April,2025 at 1:30pm. Meeting place is the entrance gate to the Estate.
|
1
|
4/16/2025 10:06:05 PM
|
5/7/2025 9:00:00 AM
|
Uitvlugt Estate towards Stewartville West Cross - PCMD.xlsx (27 KB)
||
NPTAB FD 130-2025 Construction of 2km All-weather Road - Uitvlugt.pdf (3 MB)
||
|
NPTAB FD 131-2025
|
Rehabilitation of Fertilizer Bond at Blairmont Estate A compulsory site meeting will be held at Blairmont Estate on 2nd May,2025 at 1:30pm. Meeting place is the entrance gate to the Estate.
|
|
4/16/2025 10:19:51 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FD 131-2025 Rehabilitation of Fertilizer Bond at Blairmont Estate.pdf (4 MB)
||
Rehabilitation of Fertilizer Bond Blairmont 2025 - PCMD.xlsx (44 KB)
||
|
NPTAB FA 121-2025
|
Relocation of Vacuum from Enmore to Albion Estate Required for Albion Estate
|
1
|
4/17/2025 3:46:15 PM
|
5/7/2025 9:00:00 AM
|
NPTAB FA 121-2025 Relocation of Vacuum Pan_AN.pdf (5 MB)
||
Albion - Relocation of Vacuum Pan from Enmore to Albion Blank.xlsx (22 KB)
||
Addendum vacuum pan.pdf (160 KB)
||
|
NPTAB FD 127-2025
|
Construction of 1940m Heavy Duty Revetment at Uitvlugt Estate - Lot 1-4 A compulsory site meeting will be held at Uitvlugt Estate on 30th April,2025 at 9:00 hours. Meeting place the entrance gate to the Estate.
|
|
4/17/2025 9:03:22 AM
|
5/7/2025 9:00:00 AM
|
Lot# 3 Construction of 610m LDR at ICBU - Meten-Meer-Zorg - PCMD.xlsx (46 KB)
||
Lot#1 Construction of 355m Light Duty Revetment- ICBU - Uitvlugt East - PCMD (2).xlsx (46 KB)
||
Lot#2 Construction of 365m Light Duty Revetment- Uitvlugt Estate (Fertilizer Bond) - PCMD (2).xlsx (46 KB)
||
Lot#4 Construction of 610m LDR at ICBU - DeWilliams - PCMD.xlsx (46 KB)
||
NPTAB FD 127-2025 Construction of 1940m Heavy Duty Revetment_ICBU.pdf (4 MB)
||
|
NPTAB FA 110-2025
|
Supply and Delivery Mill Turbine and Double Reduction Gearbox Required for Blairmont Estate
|
|
4/17/2025 1:24:13 PM
|
6/3/2025 9:00:00 AM
|
RFP FA 110-2025 Supply and Delivery of Mill Turbine and Double Reduction Gearbox_BCF.pdf (1 MB)
||
|
NPTAB FA 122-2025
|
Design, Build, Supply and Install One Reverse Rotation Assembly Required for Blairmont Estate
|
|
4/17/2025 1:26:47 PM
|
6/3/2025 9:00:00 AM
|
RFP FA 122-2025 Design, Build, Supply and Install One Reverse Rotation Assembly_BCF.pdf (1 MB)
||
|
NPTAB FA 124-2025
|
Supply and Installation of One 80,000 lbs/ hr moving Grate Water Tube Steam Boiler Required for Uitvlugt Estate
|
|
4/17/2025 1:42:55 PM
|
6/3/2025 9:00:00 AM
|
RFP FA 124-2025 Supply and Delivery of Steam Boiler_ICBU.pdf (1 MB)
||
|
05-2025
|
Construction of 173m Light Duty Revetment Required for Rose Hall Estate
|
|
4/22/2025 4:11:09 PM
|
5/8/2025 9:00:00 AM
|
05-2025 Construction of 173m LDR RH - Bid Document.pdf (1 MB)
||
|
06-2025
|
Rehabilitation of Chemical Bond Required for Blairmont Estate A compulsory site visit, at the bidder’s own expense, has been arranged on Wednesday, 7th May, 2025, at 10:00 hours. Contractors are kindly asked to assemble at the Administration Building – Blairmont Estate.
|
1
|
4/22/2025 4:18:39 PM
|
5/15/2025 9:00:00 AM
|
06-2025 Chemical Bond at BCF Bid Doc.pdf (1 MB)
||
|
RFP FA 136-2025
|
Rehabilitation of Lime Bond at Uitvlugt Estate A compulsory site visit, at the bidder’s own expense, has been arranged on Tuesday, 6th May, 2025, at 10:00 hours. Contractors are kindly asked to assemble at the Administration Building – Uitvlugt Estate.
|
|
4/24/2025 8:40:08 AM
|
5/15/2025 9:00:00 AM
|
RFP FA 136-2025 Lime Bond at ICBU Bid Doc.pdf (1 MB)
||
|
RFP FD 47--2025
|
Invitation For Provision Of Ten Housing Accommodations In The Lower Corentyne Region For The Period 2025-2026
|
|
4/30/2025 10:04:50 AM
|
5/22/2025 9:00:00 AM
|
RFP FD 47 Housing Accommodations in the Lower Corentyne region .pdf (302 KB)
||
|
RFP FD 34--2025
|
(Retender) Supply Of Round Up – Glyphosate 41 Ec (Herbicide) Required for the Industry
|
|
4/30/2025 10:08:08 AM
|
5/22/2025 9:00:00 AM
|
RFP FD-034-2025 Round- up Glyphosate.pdf (625 KB)
||
|
RFP FA 10-2025R
|
Retender for the Supply & Delivery of Air Cool H&F 214 Coupling and Gearbox Motor Required for Blairmont Estate
|
|
4/30/2025 1:16:51 PM
|
5/22/2025 9:00:00 AM
|
RETENDER RFP FA #010-2025 AIR COOL HF 214 COUPLING AND GEARBOX MOTOR.pdf (1 MB)
||
|
RFP FA 137-2025
|
Supply and Delivery of Trash Plates Required for The Industry
|
|
4/30/2025 1:31:14 PM
|
5/22/2025 9:00:00 AM
|
RFP FA #137-2025 SUPPLY AND DELIVERY OF TRASH PLATE.pdf (962 KB)
||
Trash plate Drawings.pdf (875 KB)
||
|
RFP FA 138-2025
|
Supply and Delivery of Scraper Plates Required for The Industry
|
|
4/30/2025 1:33:43 PM
|
5/22/2025 9:00:00 AM
|
RFP FA #138-2025 SUPPLY AND DELIVERY OF SCRAPER PLATE.pdf (969 KB)
||
Scraper plate drawings.pdf (1 MB)
||
|
RFP FA 132-2025
|
Supply and Delivery of Seamless Stainless Steel Tubes Required for Blairmont Estate
|
|
4/30/2025 1:36:46 PM
|
5/22/2025 9:00:00 AM
|
RFP FA #132-2025 SUPPLY AND DELIVERY OF SS SEAMLESS TUBES.pdf (1 MB)
||
|
RFP FA 139-2025
|
Rehabilitation of Fuel Station at Uitvlugt Estate A compulsory site visit, at the bidder’s own expense, has been arranged on Tuesday, 15th May, 2025, at 10:00 hours. Contractors are kindly asked to assemble at the Administration Building – Uitvlugt Estate.
|
|
4/30/2025 4:28:48 PM
|
5/22/2025 9:00:00 AM
|
RFP FA 139-2025 Rehabilitation of Fuel Station .pdf (919 KB)
||
Uitvlugt Rehab of Fuel Station Uitvlugt Blank.xlsx (22 KB)
||
|